Flood defense works Rimini–San Sepolcro natural gas pipeline DN 650 (26”)

Flood defence works on the Rimini-S. Sepolcro section of the natural gas pipeline DN 650 (26”) along the right bank of the Marecchia river, in the municipality of Pennabilli (RN). The works were carried out to guarantee safety of the natural gas pipelines located in the area close to the right bank of the Marecchia river. The works include a series of reinstatement work, flood defence work and protection of the current natural gas pipeline, specifically along the right bank of the Marecchia river near the built-up area of Pennabilli (RN). Length of the section: approx. 240 linear matres. Main works: • Rock barrier (mattress faced) and overflow channel • Rock covered drainage channel • Laying of cross-barriers • Reinstatement of river bed with alluvial soil

Project details

Client

Snam Rete Gas

Start

End

2010