Pipeline upgrading Spina Nord of Treviso DN 200 (8")


Diversion pipeline variation for Country DN 150 (6") for plant reconstruction no.4101568 /3 for a total length of 203 meters - Variation to the branch methane pipeline to Paese DN 150 (6") for the reconstruction of plant no. 4101568/1.1 for a total length of 116 meters - Variation to the methane pipeline connection Comune di Paese DN 250 (10") for the reconstruction of the detachment point for a total length of 30 meters - Variation to the methane pipeline connection Spina di Quinto di Treviso DN 250 (10") for the insertion of plant no. 4105138/3 for a total length of 15 meters - Variation to the Sebring Fontebasso DN 100 (4") connection methane pipeline for the reconstruction of the detachment point for a total length of 10 meters - Rebuilding of the Impresa A. Basso DN 100 (4") connection for a total length of 10 meters - Recovery of the pipeline sections out of service, preparation and subsequent insertion (Tie-ins) of the new pipelines and plants with the existing methane pipelines - executed as So.Co.Met.

Translated with www.DeepL.com/Translator (free version)

Project detail

Title

Pipeline upgrading Spina Nord of Treviso DN 200 (8")

Customer

Snam Rete Gas

Location

Treviso (Italy)

Work duration

2008