Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A6 and A7)
The project called Balkan Stream or Turkish Stream crosses Bulgaria for 474 km (295 miles). For the Client SicilSaldo we have worked on lots A6 and A7 for a total of 103km. The activities included:
- Civil works for right of way, excavation, backfill and rehabilitation
- Laying of the optical fiber - for this activity a special machine was designed in order to be able to simultaneously dig, lay and backfill
- Ancillary works of assistance for crossings and stabilization of the pipe in areas with presence of water and strong slope
Project detail
Title
Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A6 and A7)
Customer
SicilSaldo
Location
Bulgaria
Work duration
2019-2020