Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)
The project called Balkan Stream or Turkish Stream crosses Bulgaria for 474 km (295 miles). For the Client Bonatti we have worked on lots A4 and A5. The activities included:
- 44,5 Km of right of way
- Stringing
- Tie-in activities over 56,8 km
- Civil works for Osam river crossing
Project detail
Title
Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)
Customer
Bonatti
Location
Bulgaria
Work duration
2020