Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)
_800x600.jpg)

The project called Balkan Stream or Turkish Stream crosses Bulgaria for 474 km (295 miles). For the Client MaxStreicher we have worked on lots A2 and A3. The activities included:
- Installation of geocells, geotextile, ropes and steel anchors
- Humus movement
- HDPE installation (24,26 km) - for this activity a special machine was designed in order to be able to simultaneously dig, lay and backfill
- Installation of the pits and installation of FOC conduit in crossing
- Trenching
- Open cut crossing Malki river
Project detail
Title
Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)
Customer
MaxStreicher
Location
Bulgaria
Work duration
2020