Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)
The project called Balkan Stream or Turkish Stream crosses Bulgaria for 474 km (295 miles). For the Client MaxStreicher we have worked on lots A2 and A3. The activities included:
- Installation of geocells, geotextile, ropes and steel anchors
- Humus movement
- HDPE installation (24,26 km) - for this activity a special machine was designed in order to be able to simultaneously dig, lay and backfill
- Installation of the pits and installation of FOC conduit in crossing
- Trenching
- Open cut crossing Malki river
Project detail
Title
Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)
Customer
MaxStreicher
Location
Bulgaria
Work duration
2020