Laying works of a pipeline shooting
Execution of works for the laying of a resumed pipeline in a draining bed. Excavation at a depth of 11 m, handling of yard material, backfilling, deviation and draining of the river bed - performed as So.Co.Met.
Project detail
Title
Laying works of a pipeline shooting
Customer
Subwork Italia
Location
Carezzole (Italy)
Work duration
1994