Works for the construction of the pipeline connection Villaga Calce DN 100 (4") - Dolcè (VR)
Realization of controlled horizontal drilling (T.O.C.) for the Villaga Calce connection of about 900.00 m including the opencut crossing of the Adige River with DN 150 (6") pipeline of about 230.00 m - Pressure 75 bar - executed as So.Co.Met.
Project detail
Title
Works for the construction of the pipeline connection Villaga Calce DN 100 (4") - Dolcè (VR)
Customer
Snam Rete Gas
Location
Rivoli Veronese (Italy)
Work duration
2007