Execution of the crossings of the Piave river in the locality of Onigo and in the locality of Masetti for the construction of the methane pipeline Istrana - Feltre DN 600 24" section Vas - Seren del Grappa.
Execution of all the civil works connected with the realization of the methane pipeline Istrana - Feltre DN 600 24" stretch Vas - Seren del Grappa. In the execution it has been demolished a granite bench at mt. 5 under the water level - executed as So.Co.Met.
Project detail
Title
Execution of the crossings of the Piave river in the locality of Onigo and in the locality of Masetti for the construction of the methane pipeline Istrana - Feltre DN 600 24" section Vas - Seren del Grappa.
Customer
SICIM
Location
Istrana - Feltre (Italy)
Work duration
1991