PBR Technology projects S.R.L.
Below is a short list of projects developed by PBR Technology S.R.L.
We have a specific experience gained in emergency situations that occurred in various circumstances.
Foligno - Terni - Civita - Roma Ovest Pipeline DN 550 (22")
CUSTOMER:
SNAM
SNAM
LOCATION:
Rome, Italy
Rome, Italy
Work duration:
2021
2021
Ravenna – Mestre pipeline DN 550 (22")
CUSTOMER:
SNAM
SNAM
LOCATION:
Corrazzola (PD), Italy
Corrazzola (PD), Italy
Work duration:
2021
2021
Replacement of a section of 30" underground oil pipeline (DN750)
CUSTOMER:
IP
IP
LOCATION:
Roma, Italy
Roma, Italy
Work duration:
2021
2021
Upgrade Gallese compression plant
CUSTOMER:
SNAM
SNAM
LOCATION:
Gallese, Italy
Gallese, Italy
Work duration:
2021
2021
Rimini - San Sepolcro pipeline DN 750 (30”) - Section 4
CUSTOMER:
S.A.L.P.
S.A.L.P.
LOCATION:
Badia Tedalda, Italy
Badia Tedalda, Italy
Work duration:
2020-2022
2020-2022
Archaeological excavations - Gagliano - Termini Imerese pipeline DN 300 (12")
CUSTOMER:
SicilSaldo
SicilSaldo
LOCATION:
Termini Imerese, Italy
Termini Imerese, Italy
Work duration:
2020
2020
Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)
Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)
Read more
Read more
CUSTOMER:
MaxStreicher
MaxStreicher
LOCATION:
Bulgaria
Bulgaria
Work duration:
2020
2020
Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)
Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)
Read more
Read more
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Bulgaria
Bulgaria
Work duration:
2020
2020
Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A6 and A7)
Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A6 and A7)
Read more
Read more
CUSTOMER:
SicilSaldo
SicilSaldo
LOCATION:
Bulgaria
Bulgaria
Work duration:
2019-2020
2019-2020
Desio - Biassono pipeline DN 400 (16")
CUSTOMER:
SNAM
SNAM
LOCATION:
Desio, Italy
Desio, Italy
Work duration:
2019-2020
2019-2020
Abruzzo Energia Gissi connection: HDD variation and construction of hydraulic works on Cena stream, DN 500 20"
Abruzzo Energia Gissi connection: HDD variation and construction of hydraulic works on Cena stream, DN 500 20"
Read more
Read more
CUSTOMER:
Festa
Festa
LOCATION:
Chieti Provence, Italy
Chieti Provence, Italy
Work duration:
2019
2019
Upgrade Boltiere - Bergamo pipeline DN400 (16") and related activities
CUSTOMER:
SNAM
SNAM
LOCATION:
Bergamo (Italy)
Bergamo (Italy)
Work duration:
2019
2019
Maintenance for pipelines between 26" and 56" in Nord East Snam District
CUSTOMER:
S.A.L.P.
S.A.L.P.
LOCATION:
Nord East Italy
Nord East Italy
Work duration:
2019
2019
Replacement of STOGIT tanks
CUSTOMER:
STOGIT
STOGIT
LOCATION:
Sabbioncello (Italy)
Sabbioncello (Italy)
Work duration:
2016
2016
New pipe park in Fidenza
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Fidenza (Italy)
Fidenza (Italy)
Work duration:
2016
2016
Spina di Corato DN 150 (6") pipeline
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Spina di Corato - Terlizzi (Italy)
Spina di Corato - Terlizzi (Italy)
Work duration:
2016
2016
Rimini-Sansepolcro pipeline DN 650 (26")
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Verucchio (Italy)
Verucchio (Italy)
Work duration:
2015
2015
Transversale Lombarda pipeline DN 750 (30")
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Lurago d'Erba (Italy)
Lurago d'Erba (Italy)
Work duration:
2015
2015
Strengthening Derivation Pipeline DN 250 (10")
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Bassano del Grappa (VI) (Italy)
Bassano del Grappa (VI) (Italy)
Work duration:
2015
2015
Zimella - Cervignano D'Adda pipeline DN 1400 (56")
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Zimella –Cervignano D’Adda (Italy)
Zimella –Cervignano D’Adda (Italy)
Work duration:
2015
2015
Pipeline Variant Bronte - Catania DN 300 - Connection Saced DN 100 (4") - Variant in H.D.D.
Pipeline Variant Bronte - Catania DN 300 - Connection Saced DN 100 (4") - Variant in H.D.D.
Read more
Read more
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Bronte-Catania (Italy)
Bronte-Catania (Italy)
Work duration:
2014
2014
Ravenna-Chieti pipeline DN 650 (26") - Branch pipeline to Langhirano DN 200 (8")
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Parma-Pesaro e Urbino (Italy)
Parma-Pesaro e Urbino (Italy)
Work duration:
2014
2014
Primarily civil works for the decommissioning of the TC5 and TC6 gas turbines
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Minerbio-Cortemaggiore (Italy)
Minerbio-Cortemaggiore (Italy)
Work duration:
2014
2014
S. Stefano-Cortemaggiore pipeline DN 750 (30")
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Tresana-Mulazzo-La Spezia (Italy)
Tresana-Mulazzo-La Spezia (Italy)
Work duration:
2014
2014
Derivation for Arino di Dolo DN 150 and Service Area connections Arino Nord and Sud DN 100
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Dolo (Italy)
Dolo (Italy)
Work duration:
2013
2013
Arzignano-Chiampo branch pipeline DN 150
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Arzignano (Italy)
Arzignano (Italy)
Work duration:
2013
2013
Santo Stefano - Cortemaggiore pipeline DN 750 (30") and Pontremoli - Parma pipeline DN 750 (30")
Santo Stefano - Cortemaggiore pipeline DN 750 (30") and Pontremoli - Parma pipeline DN 750 (30")
Read more
Read more
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Mulazzo e Pontremoli (Italy)
Mulazzo e Pontremoli (Italy)
Work duration:
2013
2013
Renovation of the irrigation network of Gemona and Osoppo
CUSTOMER:
CONSORZIO DI BONIFICA LEDRA TAGLIAMENTO
CONSORZIO DI BONIFICA LEDRA TAGLIAMENTO
LOCATION:
Gemona e Osoppo (Italy)
Gemona e Osoppo (Italy)
Work duration:
2012
2012
Minerbio-Cortemaggiore pipeline DN 1200 (48") and Pontremoli-Parma pipeline DN 750 (30")
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Parma-Pontremoli (Italy)
Parma-Pontremoli (Italy)
Work duration:
2012
2012
Reinforcement pipeline Tarvisio-Sergnano DN 1050 and pipeline Tarvisio-Sergnano DN 900
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Brugnera (Italy)
Brugnera (Italy)
Work duration:
2012
2012
Northern Europe import pipeline DN 1200 (48")
CUSTOMER:
SNAM RETE GAS
SNAM RETE GAS
LOCATION:
Formazza (Italy)
Formazza (Italy)
Work duration:
2012
2012
Oil Pipeline "Araguaney-Banadia" DN 1050 (42")
CUSTOMER:
Sicim
Sicim
LOCATION:
Araguaney-Banadia (Colombia)
Araguaney-Banadia (Colombia)
Work duration:
2011-2013
2011-2013
Pipeline Sergnano-Pagazzano DN 300 (12'') in the town of Caravaggio (BG)
CUSTOMER:
IG Infrastrutture e Gestioni
IG Infrastrutture e Gestioni
LOCATION:
Caravaggio (Italy)
Caravaggio (Italy)
Work duration:
2011-2012
2011-2012
Opere civili di attraversamento e posa del fiume Meduna, DN 100 (4") nei comuni di Cordenons e Zoppola (PN)
Opere civili di attraversamento e posa del fiume Meduna, DN 100 (4") nei comuni di Cordenons e Zoppola (PN)
Read more
Read more
CUSTOMER:
IG Infrastrutture e Gestioni
IG Infrastrutture e Gestioni
LOCATION:
Cordenons-Zoppola (Italy)
Cordenons-Zoppola (Italy)
Work duration:
2011
2011
SNAM pipeline “Sergnano – Tarvisio, tratto Malborghetto – Tarvisio" DN 900 (36”) and related pipeline centrals
SNAM pipeline “Sergnano – Tarvisio, tratto Malborghetto – Tarvisio" DN 900 (36”) and related pipeline centrals
Read more
Read more
CUSTOMER:
SNAM RETE GAS
SNAM RETE GAS
LOCATION:
Malborghetto-Tarvisio (Italy)
Malborghetto-Tarvisio (Italy)
Work duration:
2011
2011
SNAM pipeline Mira – Mestre DN 400 (16”)
CUSTOMER:
SNAM RETE GAS
SNAM RETE GAS
LOCATION:
Mira-Mestre (Italy)
Mira-Mestre (Italy)
Work duration:
2009-2010
2009-2010
Construction methane pipeline DN 400 (16”) on Bottenigo street and Cafasso road with tie-ins in Venezia
Construction methane pipeline DN 400 (16”) on Bottenigo street and Cafasso road with tie-ins in Venezia
Read more
Read more
CUSTOMER:
A.HAK INTERNATIONAL
A.HAK INTERNATIONAL
LOCATION:
Venice (Italy)
Venice (Italy)
Work duration:
2008-2009
2008-2009
SNAM methane pipeline “Spina nord Treviso DN 200 (8”) in Treviso”
CUSTOMER:
SNAM RETE GAS
SNAM RETE GAS
LOCATION:
Treviso (Italy)
Treviso (Italy)
Work duration:
2008-2009
2008-2009
SNAM methane pipeline "Ravenna-Mestre DN 550 - Variant DN 550 (22") for crossing ditch Altipiano in Codevigo
SNAM methane pipeline "Ravenna-Mestre DN 550 - Variant DN 550 (22") for crossing ditch Altipiano in Codevigo
Read more
Read more
CUSTOMER:
SNAM RETE GAS
SNAM RETE GAS
LOCATION:
Codevigo (Italy)
Codevigo (Italy)
Work duration:
2008-2009
2008-2009
Pipeline upgrading Spina Nord of Treviso DN 200 (8")
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Treviso (Italy)
Treviso (Italy)
Work duration:
2008
2008
Martirano - Rende - Morano Calabro pipeline DN 1200 (48")
CUSTOMER:
SICIM
SICIM
LOCATION:
Martirano - Rende - Morano Calabro (Italy)
Martirano - Rende - Morano Calabro (Italy)
Work duration:
2008
2008
Pipeline DN 1200 (48") Tarvisio - Malborghetto and substitution of the existing pipeline DN 900 (36")
Pipeline DN 1200 (48") Tarvisio - Malborghetto and substitution of the existing pipeline DN 900 (36")
Read more
Read more
CUSTOMER:
Nacap- ICOP
Nacap- ICOP
LOCATION:
Camporosso in Valcanale - Tarvisio (Italy)
Camporosso in Valcanale - Tarvisio (Italy)
Work duration:
2008
2008
Ravenna - Chieti Pipeline DN 650 (26") - Variant DN 650 (26") and Rivers Crossing
CUSTOMER:
Bianco Impianti
Bianco Impianti
LOCATION:
Ravenna - Chieti (Italy)
Ravenna - Chieti (Italy)
Work duration:
2008
2008
Variant DN 400 (16")
CUSTOMER:
A.HAK INTERNATIONAL
A.HAK INTERNATIONAL
LOCATION:
Venezia (Italy)
Venezia (Italy)
Work duration:
2008
2008
Import pipeline upgrading from C.S.I. DN 1200 (48")
CUSTOMER:
A.HAK INTERNATIONAL
A.HAK INTERNATIONAL
LOCATION:
Udine (Italy)
Udine (Italy)
Work duration:
2008
2008
Tarvisio - Sergnano pipeline DN 1050 (42")
CUSTOMER:
A.HAK INTERNATIONAL
A.HAK INTERNATIONAL
LOCATION:
Treviso (Italy)
Treviso (Italy)
Work duration:
2008
2008
Pipeline connecting erg petroli DN 100 (4")
CUSTOMER:
A.HAK INTERNATIONAL
A.HAK INTERNATIONAL
LOCATION:
Ferrara (Italy)
Ferrara (Italy)
Work duration:
2008
2008
Poggio Renatico - Alessandria gas pipeline DN 1050 (42") Variant DN 1050 (42") for new Poggio Renatico power plant
Poggio Renatico - Alessandria gas pipeline DN 1050 (42") Variant DN 1050 (42") for new Poggio Renatico power plant
Read more
Read more
CUSTOMER:
A.HAK INTERNATIONAL
A.HAK INTERNATIONAL
LOCATION:
Poggio Renatico (Italy)
Poggio Renatico (Italy)
Work duration:
2008
2008
Construction of the Ravenna - Mestre DN 550 (22") pipeline
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Ravenna - Mestre (Italy)
Ravenna - Mestre (Italy)
Work duration:
2007-2008
2007-2008
Bondeno - Ferrara pipeline DN 600 (24")
CUSTOMER:
A.HAK INTERNATIONAL
A.HAK INTERNATIONAL
LOCATION:
Bondeno - Ferrara (Italy)
Bondeno - Ferrara (Italy)
Work duration:
2007
2007
Poggio Renatico - Alessandria Snam pipeline
CUSTOMER:
A.HAK INTERNATIONAL
A.HAK INTERNATIONAL
LOCATION:
Poggio Renatico - Alessandria (Italy)
Poggio Renatico - Alessandria (Italy)
Work duration:
2007
2007
Works for the construction of the pipeline connection Villaga Calce DN 100 (4") - Dolcè (VR)
Works for the construction of the pipeline connection Villaga Calce DN 100 (4") - Dolcè (VR)
Read more
Read more
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Rivoli Veronese (Italy)
Rivoli Veronese (Italy)
Work duration:
2007
2007
Construction of the 36 km Martirano - Rende section of the Martirano - Morano DN 1200 (48") pipeline
Construction of the 36 km Martirano - Rende section of the Martirano - Morano DN 1200 (48") pipeline
Read more
Read more
CUSTOMER:
SICIM
SICIM
LOCATION:
Martirano - Morano (Italy)
Martirano - Morano (Italy)
Work duration:
2007
2007
Construction works of the pipeline Venzone - Tolmezzo DN 250 (10")
CUSTOMER:
Romana costruzioni
Romana costruzioni
LOCATION:
Tolmezzo (Italy)
Tolmezzo (Italy)
Work duration:
2007
2007
Pipelines with DN < 600 mm, in the territory of Trento, Verona, Vicenza of the North-Eastern District
Pipelines with DN < 600 mm, in the territory of Trento, Verona, Vicenza of the North-Eastern District
Read more
Read more
CUSTOMER:
I.G.
I.G.
LOCATION:
Grigno (Italy)
Grigno (Italy)
Work duration:
2007
2007
Gas pipeline Flaibano - Gonars DN 750 (30") -2° Lot from vertex V273 to Gonars plant
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Gonars (Italy)
Gonars (Italy)
Work duration:
2007
2007
Bondeno - Ferrara pipeline DN 600 (24")
CUSTOMER:
A.HAK INTERNATIONAL
A.HAK INTERNATIONAL
LOCATION:
Bondeno - Ferrara (Italy)
Bondeno - Ferrara (Italy)
Work duration:
2007
2007
Sea defense works near Gela - Caltanissetta
CUSTOMER:
Mantovani
Mantovani
LOCATION:
Gela - Caltanissetta (Italy)
Gela - Caltanissetta (Italy)
Work duration:
2006
2006
New trap area DN 300 (12") at the Vigasio (VR) and Ravina (TN) plants on the Verona - Trento gas pipeline
New trap area DN 300 (12") at the Vigasio (VR) and Ravina (TN) plants on the Verona - Trento gas pipeline
Read more
Read more
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Vigasio - Ravina (Italy)
Vigasio - Ravina (Italy)
Work duration:
2006
2006
Laying of the military pipeline DN 100 (4") by crossing the Piave river
CUSTOMER:
Vidoni
Vidoni
LOCATION:
Treviso (Italy)
Treviso (Italy)
Work duration:
2006
2006
Mediterranean gas pipeline variant of Italy DN 1200 (48 ")
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Seminara (Italy)
Seminara (Italy)
Work duration:
2006
2006
Bosentino - Trento pipeline DN 400 (16")
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Bosentino - Trento (Italy)
Bosentino - Trento (Italy)
Work duration:
2006
2006
Pipeline for district heating connection Chiusa DN 100 (4")
CUSTOMER:
Snam Rete Gas
Snam Rete Gas
LOCATION:
Chiusa (BZ), Italy
Chiusa (BZ), Italy
Work duration:
2006
2006
Realization of a new DN 300 (12") trap area at the Vigasio (VR) plant on the Verona - Trento DN 300 (12") gas pipeline
Realization of a new DN 300 (12") trap area at the Vigasio (VR) plant on the Verona - Trento DN 300 (12") gas pipeline
Read more
Read more
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Vigasio (Italy)
Vigasio (Italy)
Work duration:
2006
2006
Camisano Vicentino - Zimella pipelines DN 1400 (56") and by-pass line at Zimella junction DN 1200 (48")
Camisano Vicentino - Zimella pipelines DN 1400 (56") and by-pass line at Zimella junction DN 1200 (48")
Read more
Read more
CUSTOMER:
SICIM
SICIM
LOCATION:
Camisano Vicentino - Zimella (Italy)
Camisano Vicentino - Zimella (Italy)
Work duration:
2005-2006
2005-2006
Zimella - Camisano pipeline
CUSTOMER:
SICIM
SICIM
LOCATION:
Zimella - Camisano (Italy)
Zimella - Camisano (Italy)
Work duration:
2005
2005
Variations to the Istrana-Mestre DN 750 (30"), Mestre-Trieste DN 400 (16") and Mestre-Treviso DN 200 (8") gas pipelines
Variations to the Istrana-Mestre DN 750 (30"), Mestre-Trieste DN 400 (16") and Mestre-Treviso DN 200 (8") gas pipelines
Read more
Read more
CUSTOMER:
A.Hak International
A.Hak International
LOCATION:
Mirano (Italy)
Mirano (Italy)
Work duration:
2005
2005
Campochiaro - Sulmona pipeline DN 1200 (48") - Section Vastogirardi (IS) - Sulmona (AQ)
CUSTOMER:
SICIM
SICIM
LOCATION:
Castel del Giudice (Italy)
Castel del Giudice (Italy)
Work duration:
2004-2005
2004-2005
Ravenna - Mestre pipeline
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Ravenna - Mestre (Italy)
Ravenna - Mestre (Italy)
Work duration:
2004
2004
Donada - Ca' Pasqua - Marghera pipeline
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Donada - Ca' Pasqua - Marghera (Italy)
Donada - Ca' Pasqua - Marghera (Italy)
Work duration:
2004
2004
Alfonsine - S.Bonifacio pipeline DN 300 (12") - Ravenna - Mestre pipeline DN 550 (22")
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Chioggia - Porto Viro (Italy)
Chioggia - Porto Viro (Italy)
Work duration:
2004
2004
Pipelines within the jurisdiction of the North-Eastern District, Padua, Marghera and Donada Centres
Pipelines within the jurisdiction of the North-Eastern District, Padua, Marghera and Donada Centres
Read more
Read more
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Veneto (Italy)
Veneto (Italy)
Work duration:
2004
2004
Pipeline Malborghetto - Bordano DN 1200 (48") - Section Malborghetto - Pontebba
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Udine (Italy)
Udine (Italy)
Work duration:
2003-2004
2003-2004
Bordano - Flaibano pipeline DN 1200 (48")
CUSTOMER:
Nacap
Nacap
LOCATION:
Bordano - Flaibano (Italy)
Bordano - Flaibano (Italy)
Work duration:
2003
2003
Snam Malborghetto - Bordano pipeline DN 1200 (48")
CUSTOMER:
Ghizzoni
Ghizzoni
LOCATION:
Malborghetto - Bordano (Italy)
Malborghetto - Bordano (Italy)
Work duration:
2002
2002
Execution of civil works related to the construction of the Pordenone - Flaibano pipeline
CUSTOMER:
SICIM
SICIM
LOCATION:
Pordenone (Italy)
Pordenone (Italy)
Work duration:
2001-2002
2001-2002
Construction of the Piantede - Berbenno pipeline
CUSTOMER:
SNAM
SNAM
LOCATION:
Piantede - Berbenno
Piantede - Berbenno
Work duration:
2001
2001
Masera-Mortara pipeline DN 850 (34")
CUSTOMER:
Ghizzoni
Ghizzoni
LOCATION:
Mortara (Italy)
Mortara (Italy)
Work duration:
2000-2001
2000-2001
Construction of the pipeline Polaveno - Darfo
CUSTOMER:
SNAM
SNAM
LOCATION:
Polaveno - Darfo (Italy)
Polaveno - Darfo (Italy)
Work duration:
2000
2000
Opencut crossing Cornia River
CUSTOMER:
Snam
Snam
LOCATION:
Parma (italy)
Parma (italy)
Work duration:
2000
2000
Variant to the Cortemaggiore - Turin gas pipeline
CUSTOMER:
Snam
Snam
LOCATION:
Nord West of Italy
Nord West of Italy
Work duration:
2000
2000
Pordenone-oderzo-Istrana upgrading pipeline DN 1200 (48")
CUSTOMER:
Spie Capag
Spie Capag
LOCATION:
Friuli Venezia Giulia (Italy)
Friuli Venezia Giulia (Italy)
Work duration:
1999
1999
Northern European import pipeline DN 1200 (48"): Gravellona Toce - Invorio section
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Piemonte (Italy)
Piemonte (Italy)
Work duration:
1999
1999
Opencut crossing Guadiana river
CUSTOMER:
ACS and Bonatti
ACS and Bonatti
LOCATION:
Merida (Spain)
Merida (Spain)
Work duration:
1998
1998
Gas pipeline Maratea - Lagonegro branch - sector n.13
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Maratea (Italy)
Maratea (Italy)
Work duration:
1998
1998
Gas pipeline "Rotonda Policoro" - sector n.14
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Lauria (Italy)
Lauria (Italy)
Work duration:
1998
1998
Gas pipeline Settimo Torinese - Rivoli
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Settimo Torinese (Italy)
Settimo Torinese (Italy)
Work duration:
1998
1998
Opencut crossing Duero river
CUSTOMER:
Araza U.T.E.
Araza U.T.E.
LOCATION:
Castilla y Leon Region (Spain)
Castilla y Leon Region (Spain)
Work duration:
1997
1997
Edison thermoelectric pipeline connection
CUSTOMER:
Sicim
Sicim
LOCATION:
Parma province (Italy)
Parma province (Italy)
Work duration:
1997
1997
Accommodation beach Pellestrina, Venice
CUSTOMER:
Soc. consortile ripascimenti Venezia - Roma
Soc. consortile ripascimenti Venezia - Roma
LOCATION:
Venice (Italy)
Venice (Italy)
Work duration:
1996
1996
Gas pipeline Montpellier - Nimes
CUSTOMER:
DLE - Bonatti
DLE - Bonatti
LOCATION:
South of France
South of France
Work duration:
1996
1996
Opencut crossing - Ticino River - DN 750 (36")
CUSTOMER:
Unione SpA
Unione SpA
LOCATION:
Besate (Italy)
Besate (Italy)
Work duration:
1996
1996
Opencut crossing - Dora River - DN 400 (16") section Hone - Champ de Praz
CUSTOMER:
TreColli
TreColli
LOCATION:
Work duration:
Gas pipeline DN 400 (16") - Cortamaggiore-Genova, section Voghera-Novi Ligure
CUSTOMER:
Sintec
Sintec
LOCATION:
Genova (Italy)
Genova (Italy)
Work duration:
1996
1996
Gas pipeline DN 1200 (48") - Marradi - Castelbolognese
CUSTOMER:
Sicim
Sicim
LOCATION:
Forlì (Italy)
Forlì (Italy)
Work duration:
1996
1996
Gas pipeline DN 1200 (48") - Parma - Cortemaggiore
CUSTOMER:
Sicim
Sicim
LOCATION:
Parma - Cortemaggione (Italy)
Parma - Cortemaggione (Italy)
Work duration:
1995
1995
Demolition of building in Rue des alouettes de la villette
CUSTOMER:
Promopar
Promopar
LOCATION:
Paris (France)
Paris (France)
Work duration:
1995
1995
Gas pipeline DN 1200 (48") Mortara - Rognano
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Mortara - Rognano (Italy)
Mortara - Rognano (Italy)
Work duration:
1995
1995
Gas pipeline Cervignano D'adda - Rivolta D'Adda DN 1200 (48")
CUSTOMER:
SAIPEM
SAIPEM
LOCATION:
Cervignano D'Adda (Italy)
Cervignano D'Adda (Italy)
Work duration:
1995
1995
SNAM Pipeline Ripalta-Cortemaggiore DN 1200 (48 ")
CUSTOMER:
SAIPEM
SAIPEM
LOCATION:
Caorso e Caselle Landi (Italy)
Caorso e Caselle Landi (Italy)
Work duration:
1994
1994
Excavation for the construction of the main irrigation canal "Haut-service".
CUSTOMER:
Icori estero
Icori estero
LOCATION:
Abda-Doukkala (Morocco)
Abda-Doukkala (Morocco)
Work duration:
1994
1994
Laying works of a pipeline shooting
CUSTOMER:
Subwork Italia
Subwork Italia
LOCATION:
Carezzole (Italy)
Carezzole (Italy)
Work duration:
1994
1994
River crossing for the realization and integration of aqueducts in the Treviso area
CUSTOMER:
Idrotrev Scarl
Idrotrev Scarl
LOCATION:
Treviso (Italy)
Treviso (Italy)
Work duration:
1994
1994
SNAM DN 1200 (48") methane pipeline sub-river crossing of the Arno river
CUSTOMER:
Ghizzoni
Ghizzoni
LOCATION:
Lateriana (Italy)
Lateriana (Italy)
Work duration:
1994
1994
Excavation of line for SNAM pipeline section Cervignano D'Adda - Rivolta D'Adda DN 1200 (48")
Excavation of line for SNAM pipeline section Cervignano D'Adda - Rivolta D'Adda DN 1200 (48")
Read more
Read more
CUSTOMER:
EUMOTERMAR
EUMOTERMAR
LOCATION:
Cervignano D'Adda - Rivolta D'Adda (Italy)
Cervignano D'Adda - Rivolta D'Adda (Italy)
Work duration:
1994
1994
Emergency intervention for the construction of the Montechecco landfill
CUSTOMER:
Ecopadana
Ecopadana
LOCATION:
La Spezia (Italy)
La Spezia (Italy)
Work duration:
1994
1994
Rock excavation for gas pipeline DN 100 (40")
CUSTOMER:
Bonatti Rotus GMBH
Bonatti Rotus GMBH
LOCATION:
Pirmasens (Germany)
Pirmasens (Germany)
Work duration:
1994
1994
Excavation for the double penstock for Enel power plant
CUSTOMER:
Enel
Enel
LOCATION:
Cordenonds (Italy)
Cordenonds (Italy)
Work duration:
1993-1994
1993-1994
Crossing of the sub-river Olona torrent
CUSTOMER:
UNIMONT
UNIMONT
LOCATION:
Tradate (Italy)
Tradate (Italy)
Work duration:
1993
1993
Excavations and earthworks for the "saturina" landfill
CUSTOMER:
SIGI
SIGI
LOCATION:
La Spezia (Italy)
La Spezia (Italy)
Work duration:
1993
1993
Buccino - Montesano pipeline
CUSTOMER:
SAIPEM
SAIPEM
LOCATION:
Buccino - Montesano (Italy)
Buccino - Montesano (Italy)
Work duration:
1993
1993
Ponente Ligure pipeline
CUSTOMER:
I.CO.GEM.
I.CO.GEM.
LOCATION:
Ponente Ligure (Italy)
Ponente Ligure (Italy)
Work duration:
1993
1993
Sub-river crossing for the Magra river methane pipeline
CUSTOMER:
Ghizzoni
Ghizzoni
LOCATION:
Piani di Arcola (Italy)
Piani di Arcola (Italy)
Work duration:
1993
1993
Crossing for Snam gas pipeline of Dora - Baltea river
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Crescentino (Italy)
Crescentino (Italy)
Work duration:
1993
1993
Snam pipeline DN 750 (30") section Poirino - Nichelino
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Poirino - Nichelino (Italy)
Poirino - Nichelino (Italy)
Work duration:
1993
1993
Emergency intervention for Agip outbreak of Trecate
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Trecate (Italy)
Trecate (Italy)
Work duration:
1993
1993
Execution of sub-river crossing for AGIP and SNAM gas pipeline
CUSTOMER:
Bonatti
Bonatti
LOCATION:
Galiate (Italy)
Galiate (Italy)
Work duration:
1992
1992
River crossing for the realization of the methane pipeline DN 900 (36") Terranuova B. - Montelupo F.
River crossing for the realization of the methane pipeline DN 900 (36") Terranuova B. - Montelupo F.
Read more
Read more
CUSTOMER:
Unione SpA
Unione SpA
LOCATION:
Firenze (Italy)
Firenze (Italy)
Work duration:
1992
1992
Sub-river crossing in the Borgo Valsugana section for the construction of the DN 600 (24") pipeline
Sub-river crossing in the Borgo Valsugana section for the construction of the DN 600 (24") pipeline
Read more
Read more
CUSTOMER:
SICIM
SICIM
LOCATION:
Borgo Valsugana (Italy)
Borgo Valsugana (Italy)
Work duration:
1992
1992
Melizzano - Vastogirardi gas pipeline
CUSTOMER:
SAIPEM
SAIPEM
LOCATION:
Pescolanciano - Isernia (Italy)
Pescolanciano - Isernia (Italy)
Work duration:
1992
1992
Execution of N.11 sub-river crossings including the connection paths in the stretch Vasto - S. Salvo
Execution of N.11 sub-river crossings including the connection paths in the stretch Vasto - S. Salvo
Read more
Read more
CUSTOMER:
SAIPEM
SAIPEM
LOCATION:
Vasto (Italy)
Vasto (Italy)
Work duration:
1991
1991
Execution of the crossings of the Piave river in the locality of Onigo and in the locality of Masetti for the construction of the methane pipeline Istrana - Feltre DN 600 24" section Vas - Seren del Grappa.
Execution of the crossings of the Piave river in the locality of Onigo and in the locality of Masetti for the construction of the methane pipeline Istrana - Feltre DN 600 24" section Vas - Seren del Grappa.
Read more
Read more
CUSTOMER:
SICIM
SICIM
LOCATION:
Istrana - Feltre (Italy)
Istrana - Feltre (Italy)
Work duration:
1991
1991
Intervention for the execution of sub-bed crossing of Isonzo * Vipacco 1 * Vipacco 2 rivers
Intervention for the execution of sub-bed crossing of Isonzo * Vipacco 1 * Vipacco 2 rivers
Read more
Read more
CUSTOMER:
SAIPEM
SAIPEM
LOCATION:
Gorizia (Italy)
Gorizia (Italy)
Work duration:
1991
1991
U.R.S.S. importation gas pipeline section Oderzo - Istrana
CUSTOMER:
Unione SpA
Unione SpA
LOCATION:
Ponte della Priula (Italy)
Ponte della Priula (Italy)
Work duration:
1990
1990
Demolition of ITALCEMENTI buildings
CUSTOMER:
Lorigiola Alessandro
Lorigiola Alessandro
LOCATION:
Padova
Padova
Work duration:
1990
1990
Chiuduno - Albino gas pipeline Entratico - Albino section DN 400 (16")
CUSTOMER:
Ghizzoni SpA
Ghizzoni SpA
LOCATION:
Albino - Italy
Albino - Italy
Work duration:
1990
1990