PBR Technology projects S.R.L.


Below is a short list of projects developed by PBR Technology S.R.L.
We have a specific experience gained in emergency situations that occurred in various circumstances.

Foligno - Terni - Civita - Roma Ovest Pipeline DN 550 (22")

Foligno - Terni - Civita - Roma Ovest Pipeline DN 550 (22")

Read more
CUSTOMER:
SNAM
LOCATION:
Rome, Italy
Work duration:
2021

Ravenna – Mestre pipeline DN 550 (22")

Ravenna – Mestre pipeline DN 550 (22")

Read more
CUSTOMER:
SNAM
LOCATION:
Corrazzola (PD), Italy
Work duration:
2021

Replacement of a section of 30" underground oil pipeline (DN750)

Replacement of a section of 30" underground oil pipeline (DN750)

Read more
CUSTOMER:
IP
LOCATION:
Roma, Italy
Work duration:
2021

Upgrade Gallese compression plant

Upgrade Gallese compression plant

Read more
CUSTOMER:
SNAM
LOCATION:
Gallese, Italy
Work duration:
2021

Rimini - San Sepolcro pipeline DN 750 (30”) - Section 4

Rimini - San Sepolcro pipeline DN 750 (30”) - Section 4

Read more
CUSTOMER:
S.A.L.P.
LOCATION:
Badia Tedalda, Italy
Work duration:
2020-2022

Archaeological excavations - Gagliano - Termini Imerese pipeline DN 300 (12")

Archaeological excavations - Gagliano - Termini Imerese pipeline DN 300 (12")

Read more
CUSTOMER:
SicilSaldo
LOCATION:
Termini Imerese, Italy
Work duration:
2020

Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)

Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)

Read more
CUSTOMER:
MaxStreicher
LOCATION:
Bulgaria
Work duration:
2020

Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)

Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline DN 1200 (48") to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A4 and A5)

Read more
CUSTOMER:
Bonatti
LOCATION:
Bulgaria
Work duration:
2020

Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A6 and A7)

Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north gas pipeline to the Bulgarian-Serbian border. constrcution of section B (Sub Stages A6 and A7)

Read more
CUSTOMER:
SicilSaldo
LOCATION:
Bulgaria
Work duration:
2019-2020

Desio - Biassono pipeline DN 400 (16")

Desio - Biassono pipeline DN 400 (16")

Read more
CUSTOMER:
SNAM
LOCATION:
Desio, Italy
Work duration:
2019-2020

Abruzzo Energia Gissi connection: HDD variation and construction of hydraulic works on Cena stream, DN 500 20"

Abruzzo Energia Gissi connection: HDD variation and construction of hydraulic works on Cena stream, DN 500 20"

Read more
CUSTOMER:
Festa
LOCATION:
Chieti Provence, Italy
Work duration:
2019

Upgrade Boltiere - Bergamo pipeline DN400 (16") and related activities

Upgrade Boltiere - Bergamo pipeline DN400 (16") and related activities

Read more
CUSTOMER:
SNAM
LOCATION:
Bergamo (Italy)
Work duration:
2019

Maintenance for pipelines between 26" and 56" in Nord East Snam District

Maintenance for pipelines between 26" and 56" in Nord East Snam District

Read more
CUSTOMER:
S.A.L.P.
LOCATION:
Nord East Italy
Work duration:
2019

Replacement of STOGIT tanks

Replacement of STOGIT tanks

Read more
CUSTOMER:
STOGIT
LOCATION:
Sabbioncello (Italy)
Work duration:
2016

New pipe park in Fidenza

New pipe park in Fidenza

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Fidenza (Italy)
Work duration:
2016

Spina di Corato DN 150 (6") pipeline

Spina di Corato DN 150 (6") pipeline

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Spina di Corato - Terlizzi (Italy)
Work duration:
2016

Rimini-Sansepolcro pipeline DN 650 (26")

Rimini-Sansepolcro pipeline DN 650 (26")

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Verucchio (Italy)
Work duration:
2015

Transversale Lombarda pipeline DN 750 (30")

Transversale Lombarda pipeline DN 750 (30")

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Lurago d'Erba (Italy)
Work duration:
2015

Strengthening Derivation Pipeline DN 250 (10")

Strengthening Derivation Pipeline DN 250 (10")

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Bassano del Grappa (VI) (Italy)
Work duration:
2015

Zimella - Cervignano D'Adda pipeline DN 1400 (56")

Zimella - Cervignano D'Adda pipeline DN 1400 (56")

Read more
CUSTOMER:
Bonatti
LOCATION:
Zimella –Cervignano D’Adda (Italy)
Work duration:
2015

Pipeline Variant Bronte - Catania DN 300 - Connection Saced DN 100 (4") - Variant in H.D.D.

Pipeline Variant Bronte - Catania DN 300 - Connection Saced DN 100 (4") - Variant in H.D.D.

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Bronte-Catania (Italy)
Work duration:
2014

Ravenna-Chieti pipeline DN 650 (26") - Branch pipeline to Langhirano DN 200 (8")

Ravenna-Chieti pipeline DN 650 (26") - Branch pipeline to Langhirano DN 200 (8")

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Parma-Pesaro e Urbino (Italy)
Work duration:
2014

Primarily civil works for the decommissioning of the TC5 and TC6 gas turbines

Primarily civil works for the decommissioning of the TC5 and TC6 gas turbines

Read more
CUSTOMER:
Bonatti
LOCATION:
Minerbio-Cortemaggiore (Italy)
Work duration:
2014

S. Stefano-Cortemaggiore pipeline DN 750 (30")

S. Stefano-Cortemaggiore pipeline DN 750 (30")

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Tresana-Mulazzo-La Spezia (Italy)
Work duration:
2014

Derivation for Arino di Dolo DN 150 and Service Area connections Arino Nord and Sud DN 100

Derivation for Arino di Dolo DN 150 and Service Area connections Arino Nord and Sud DN 100

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Dolo (Italy)
Work duration:
2013

Arzignano-Chiampo branch pipeline DN 150

Arzignano-Chiampo branch pipeline DN 150

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Arzignano (Italy)
Work duration:
2013

Santo Stefano - Cortemaggiore pipeline DN 750 (30") and Pontremoli - Parma pipeline DN 750 (30")

Santo Stefano - Cortemaggiore pipeline DN 750 (30") and Pontremoli - Parma pipeline DN 750 (30")

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Mulazzo e Pontremoli (Italy)
Work duration:
2013

Renovation of the irrigation network of Gemona and Osoppo

Renovation of the irrigation network of Gemona and Osoppo

Read more
CUSTOMER:
CONSORZIO DI BONIFICA LEDRA TAGLIAMENTO
LOCATION:
Gemona e Osoppo (Italy)
Work duration:
2012

Minerbio-Cortemaggiore pipeline DN 1200 (48") and Pontremoli-Parma pipeline DN 750 (30")

Minerbio-Cortemaggiore pipeline DN 1200 (48") and Pontremoli-Parma pipeline DN 750 (30")

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Parma-Pontremoli (Italy)
Work duration:
2012

Reinforcement pipeline Tarvisio-Sergnano DN 1050 and pipeline Tarvisio-Sergnano DN 900

Reinforcement pipeline Tarvisio-Sergnano DN 1050 and pipeline Tarvisio-Sergnano DN 900

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Brugnera (Italy)
Work duration:
2012

Northern Europe import pipeline DN 1200 (48")

Northern Europe import pipeline DN 1200 (48")

Read more
CUSTOMER:
SNAM RETE GAS
LOCATION:
Formazza (Italy)
Work duration:
2012

Oil Pipeline "Araguaney-Banadia" DN 1050 (42")

Oil Pipeline "Araguaney-Banadia" DN 1050 (42")

Read more
CUSTOMER:
Sicim
LOCATION:
Araguaney-Banadia (Colombia)
Work duration:
2011-2013

Pipeline Sergnano-Pagazzano DN 300 (12'') in the town of Caravaggio (BG)

Pipeline Sergnano-Pagazzano DN 300 (12'') in the town of Caravaggio (BG)

Read more
CUSTOMER:
IG Infrastrutture e Gestioni
LOCATION:
Caravaggio (Italy)
Work duration:
2011-2012

Opere civili di attraversamento e posa del fiume Meduna, DN 100 (4") nei comuni di Cordenons e Zoppola (PN)

Opere civili di attraversamento e posa del fiume Meduna, DN 100 (4") nei comuni di Cordenons e Zoppola (PN)

Read more
CUSTOMER:
IG Infrastrutture e Gestioni
LOCATION:
Cordenons-Zoppola (Italy)
Work duration:
2011

SNAM pipeline “Sergnano – Tarvisio, tratto Malborghetto – Tarvisio" DN 900 (36”) and related pipeline centrals

SNAM pipeline “Sergnano – Tarvisio, tratto Malborghetto – Tarvisio" DN 900 (36”) and related pipeline centrals

Read more
CUSTOMER:
SNAM RETE GAS
LOCATION:
Malborghetto-Tarvisio (Italy)
Work duration:
2011

SNAM pipeline Mira – Mestre DN 400 (16”)

SNAM pipeline Mira – Mestre DN 400 (16”)

Read more
CUSTOMER:
SNAM RETE GAS
LOCATION:
Mira-Mestre (Italy)
Work duration:
2009-2010

Construction methane pipeline DN 400 (16”) on Bottenigo street and Cafasso road with tie-ins in Venezia

Construction methane pipeline DN 400 (16”) on Bottenigo street and Cafasso road with tie-ins in Venezia

Read more
CUSTOMER:
A.HAK INTERNATIONAL
LOCATION:
Venice (Italy)
Work duration:
2008-2009

SNAM methane pipeline “Spina nord Treviso DN 200 (8”) in Treviso”

SNAM methane pipeline “Spina nord Treviso DN 200 (8”) in Treviso”

Read more
CUSTOMER:
SNAM RETE GAS
LOCATION:
Treviso (Italy)
Work duration:
2008-2009

SNAM methane pipeline "Ravenna-Mestre DN 550 - Variant DN 550 (22") for crossing ditch Altipiano in Codevigo

SNAM methane pipeline "Ravenna-Mestre DN 550 - Variant DN 550 (22") for crossing ditch Altipiano in Codevigo

Read more
CUSTOMER:
SNAM RETE GAS
LOCATION:
Codevigo (Italy)
Work duration:
2008-2009

Pipeline upgrading Spina Nord of Treviso DN 200 (8")

Pipeline upgrading Spina Nord of Treviso DN 200 (8")

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Treviso (Italy)
Work duration:
2008

Martirano - Rende - Morano Calabro pipeline DN 1200 (48")

Martirano - Rende - Morano Calabro pipeline DN 1200 (48")

Read more
CUSTOMER:
SICIM
LOCATION:
Martirano - Rende - Morano Calabro (Italy)
Work duration:
2008

Pipeline DN 1200 (48") Tarvisio - Malborghetto and substitution of the existing pipeline DN 900 (36")

Pipeline DN 1200 (48") Tarvisio - Malborghetto and substitution of the existing pipeline DN 900 (36")

Read more
CUSTOMER:
Nacap- ICOP
LOCATION:
Camporosso in Valcanale - Tarvisio (Italy)
Work duration:
2008

Ravenna - Chieti Pipeline DN 650 (26") - Variant DN 650 (26") and Rivers Crossing

Ravenna - Chieti Pipeline DN 650 (26") - Variant DN 650 (26") and Rivers Crossing

Read more
CUSTOMER:
Bianco Impianti
LOCATION:
Ravenna - Chieti (Italy)
Work duration:
2008

Variant DN 400 (16")

Variant DN 400 (16")

Read more
CUSTOMER:
A.HAK INTERNATIONAL
LOCATION:
Venezia (Italy)
Work duration:
2008

Import pipeline upgrading from C.S.I. DN 1200 (48")

Import pipeline upgrading from C.S.I. DN 1200 (48")

Read more
CUSTOMER:
A.HAK INTERNATIONAL
LOCATION:
Udine (Italy)
Work duration:
2008

Tarvisio - Sergnano pipeline DN 1050 (42")

Tarvisio - Sergnano pipeline DN 1050 (42")

Read more
CUSTOMER:
A.HAK INTERNATIONAL
LOCATION:
Treviso (Italy)
Work duration:
2008

Pipeline connecting erg petroli DN 100 (4")

Pipeline connecting erg petroli DN 100 (4")

Read more
CUSTOMER:
A.HAK INTERNATIONAL
LOCATION:
Ferrara (Italy)
Work duration:
2008

Poggio Renatico - Alessandria gas pipeline DN 1050 (42") Variant DN 1050 (42") for new Poggio Renatico power plant

Poggio Renatico - Alessandria gas pipeline DN 1050 (42") Variant DN 1050 (42") for new Poggio Renatico power plant

Read more
CUSTOMER:
A.HAK INTERNATIONAL
LOCATION:
Poggio Renatico (Italy)
Work duration:
2008

Construction of the Ravenna - Mestre DN 550 (22") pipeline

Construction of the Ravenna - Mestre DN 550 (22") pipeline

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Ravenna - Mestre (Italy)
Work duration:
2007-2008

CUSTOMER:
LOCATION:
Work duration:
2007

CUSTOMER:
LOCATION:
Work duration:
2007

Bondeno - Ferrara pipeline DN 600 (24")

Bondeno - Ferrara pipeline DN 600 (24")

Read more
CUSTOMER:
A.HAK INTERNATIONAL
LOCATION:
Bondeno - Ferrara (Italy)
Work duration:
2007

Poggio Renatico - Alessandria Snam pipeline

Poggio Renatico - Alessandria Snam pipeline

Read more
CUSTOMER:
A.HAK INTERNATIONAL
LOCATION:
Poggio Renatico - Alessandria (Italy)
Work duration:
2007

Works for the construction of the pipeline connection Villaga Calce DN 100 (4") - Dolcè (VR)

Works for the construction of the pipeline connection Villaga Calce DN 100 (4") - Dolcè (VR)

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Rivoli Veronese (Italy)
Work duration:
2007

Construction of the 36 km Martirano - Rende section of the Martirano - Morano DN 1200 (48") pipeline

Construction of the 36 km Martirano - Rende section of the Martirano - Morano DN 1200 (48") pipeline

Read more
CUSTOMER:
SICIM
LOCATION:
Martirano - Morano (Italy)
Work duration:
2007

Construction works of the pipeline Venzone - Tolmezzo DN 250 (10")

Construction works of the pipeline Venzone - Tolmezzo DN 250 (10")

Read more
CUSTOMER:
Romana costruzioni
LOCATION:
Tolmezzo (Italy)
Work duration:
2007

Pipelines with DN < 600 mm, in the territory of Trento, Verona, Vicenza of the North-Eastern District

Pipelines with DN < 600 mm, in the territory of Trento, Verona, Vicenza of the North-Eastern District

Read more
CUSTOMER:
I.G.
LOCATION:
Grigno (Italy)
Work duration:
2007

Gas pipeline Flaibano - Gonars DN 750 (30") -2° Lot from vertex V273 to Gonars plant

Gas pipeline Flaibano - Gonars DN 750 (30") -2° Lot from vertex V273 to Gonars plant

Read more
CUSTOMER:
Bonatti
LOCATION:
Gonars (Italy)
Work duration:
2007

Bondeno - Ferrara pipeline DN 600 (24")

Bondeno - Ferrara pipeline DN 600 (24")

Read more
CUSTOMER:
A.HAK INTERNATIONAL
LOCATION:
Bondeno - Ferrara (Italy)
Work duration:
2007

Sea defense works near Gela - Caltanissetta

Sea defense works near Gela - Caltanissetta

Read more
CUSTOMER:
Mantovani
LOCATION:
Gela - Caltanissetta (Italy)
Work duration:
2006

New trap area DN 300 (12") at the Vigasio (VR) and Ravina (TN) plants on the Verona - Trento gas pipeline

New trap area DN 300 (12") at the Vigasio (VR) and Ravina (TN) plants on the Verona - Trento gas pipeline

Read more
CUSTOMER:
Bonatti
LOCATION:
Vigasio - Ravina (Italy)
Work duration:
2006

Laying of the military pipeline DN 100 (4") by crossing the Piave river

Laying of the military pipeline DN 100 (4") by crossing the Piave river

Read more
CUSTOMER:
Vidoni
LOCATION:
Treviso (Italy)
Work duration:
2006

Mediterranean gas pipeline variant of Italy DN 1200 (48 ")

Mediterranean gas pipeline variant of Italy DN 1200 (48 ")

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Seminara (Italy)
Work duration:
2006

Bosentino - Trento pipeline DN 400 (16")

Bosentino - Trento pipeline DN 400 (16")

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Bosentino - Trento (Italy)
Work duration:
2006

Pipeline for district heating connection Chiusa DN 100 (4")

Pipeline for district heating connection Chiusa DN 100 (4")

Read more
CUSTOMER:
Snam Rete Gas
LOCATION:
Chiusa (BZ), Italy
Work duration:
2006

Realization of a new DN 300 (12") trap area at the Vigasio (VR) plant on the Verona - Trento DN 300 (12") gas pipeline

Realization of a new DN 300 (12") trap area at the Vigasio (VR) plant on the Verona - Trento DN 300 (12") gas pipeline

Read more
CUSTOMER:
Bonatti
LOCATION:
Vigasio (Italy)
Work duration:
2006

Camisano Vicentino - Zimella pipelines DN 1400 (56") and by-pass line at Zimella junction DN 1200 (48")

Camisano Vicentino - Zimella pipelines DN 1400 (56") and by-pass line at Zimella junction DN 1200 (48")

Read more
CUSTOMER:
SICIM
LOCATION:
Camisano Vicentino - Zimella (Italy)
Work duration:
2005-2006

Zimella - Camisano pipeline

Zimella - Camisano pipeline

Read more
CUSTOMER:
SICIM
LOCATION:
Zimella - Camisano (Italy)
Work duration:
2005

Variations to the Istrana-Mestre DN 750 (30"), Mestre-Trieste DN 400 (16") and Mestre-Treviso DN 200 (8") gas pipelines

Variations to the Istrana-Mestre DN 750 (30"), Mestre-Trieste DN 400 (16") and Mestre-Treviso DN 200 (8") gas pipelines

Read more
CUSTOMER:
A.Hak International
LOCATION:
Mirano (Italy)
Work duration:
2005

Campochiaro - Sulmona pipeline DN 1200 (48") - Section Vastogirardi (IS) - Sulmona (AQ)

Campochiaro - Sulmona pipeline DN 1200 (48") - Section Vastogirardi (IS) - Sulmona (AQ)

Read more
CUSTOMER:
SICIM
LOCATION:
Castel del Giudice (Italy)
Work duration:
2004-2005

Ravenna - Mestre pipeline

Ravenna - Mestre pipeline

Read more
CUSTOMER:
Bonatti
LOCATION:
Ravenna - Mestre (Italy)
Work duration:
2004

Donada - Ca' Pasqua - Marghera pipeline

Donada - Ca' Pasqua - Marghera pipeline

Read more
CUSTOMER:
Bonatti
LOCATION:
Donada - Ca' Pasqua - Marghera (Italy)
Work duration:
2004

Alfonsine - S.Bonifacio pipeline DN 300 (12") - Ravenna - Mestre pipeline DN 550 (22")

Alfonsine - S.Bonifacio pipeline DN 300 (12") - Ravenna - Mestre pipeline DN 550 (22")

Read more
CUSTOMER:
Bonatti
LOCATION:
Chioggia - Porto Viro (Italy)
Work duration:
2004

Pipelines within the jurisdiction of the North-Eastern District, Padua, Marghera and Donada Centres

Pipelines within the jurisdiction of the North-Eastern District, Padua, Marghera and Donada Centres

Read more
CUSTOMER:
Bonatti
LOCATION:
Veneto (Italy)
Work duration:
2004

Pipeline Malborghetto - Bordano DN 1200 (48") - Section Malborghetto - Pontebba

Pipeline Malborghetto - Bordano DN 1200 (48") - Section Malborghetto - Pontebba

Read more
CUSTOMER:
Bonatti
LOCATION:
Udine (Italy)
Work duration:
2003-2004

Bordano - Flaibano pipeline DN 1200 (48")

Bordano - Flaibano pipeline DN 1200 (48")

Read more
CUSTOMER:
Nacap
LOCATION:
Bordano - Flaibano (Italy)
Work duration:
2003

Snam Malborghetto - Bordano pipeline DN 1200 (48")

Snam Malborghetto - Bordano pipeline DN 1200 (48")

Read more
CUSTOMER:
Ghizzoni
LOCATION:
Malborghetto - Bordano (Italy)
Work duration:
2002

CUSTOMER:
LOCATION:
Work duration:
2001

Execution of civil works related to the construction of the Pordenone - Flaibano pipeline

Execution of civil works related to the construction of the Pordenone - Flaibano pipeline

Read more
CUSTOMER:
SICIM
LOCATION:
Pordenone (Italy)
Work duration:
2001-2002

Construction of the Piantede - Berbenno pipeline

Construction of the Piantede - Berbenno pipeline

Read more
CUSTOMER:
SNAM
LOCATION:
Piantede - Berbenno
Work duration:
2001

CUSTOMER:
LOCATION:
Work duration:
2000

Masera-Mortara pipeline DN 850 (34")

Masera-Mortara pipeline DN 850 (34")

Read more
CUSTOMER:
Ghizzoni
LOCATION:
Mortara (Italy)
Work duration:
2000-2001

Construction of the pipeline Polaveno - Darfo

Construction of the pipeline Polaveno - Darfo

Read more
CUSTOMER:
SNAM
LOCATION:
Polaveno - Darfo (Italy)
Work duration:
2000

Opencut crossing Cornia River

Opencut crossing Cornia River

Read more
CUSTOMER:
Snam
LOCATION:
Parma (italy)
Work duration:
2000

Variant to the Cortemaggiore - Turin gas pipeline

Variant to the Cortemaggiore - Turin gas pipeline

Read more
CUSTOMER:
Snam
LOCATION:
Nord West of Italy
Work duration:
2000

Pordenone-oderzo-Istrana upgrading pipeline DN 1200 (48")

Pordenone-oderzo-Istrana upgrading pipeline DN 1200 (48")

Read more
CUSTOMER:
Spie Capag
LOCATION:
Friuli Venezia Giulia (Italy)
Work duration:
1999

Northern European import pipeline DN 1200 (48"): Gravellona Toce - Invorio section

Northern European import pipeline DN 1200 (48"): Gravellona Toce - Invorio section

Read more
CUSTOMER:
Bonatti
LOCATION:
Piemonte (Italy)
Work duration:
1999

Opencut crossing Guadiana river

Opencut crossing Guadiana river

Read more
CUSTOMER:
ACS and Bonatti
LOCATION:
Merida (Spain)
Work duration:
1998

Gas pipeline Maratea - Lagonegro branch - sector n.13

Gas pipeline Maratea - Lagonegro branch - sector n.13

Read more
CUSTOMER:
Bonatti
LOCATION:
Maratea (Italy)
Work duration:
1998

Gas pipeline "Rotonda Policoro" - sector n.14

Gas pipeline "Rotonda Policoro" - sector n.14

Read more
CUSTOMER:
Bonatti
LOCATION:
Lauria (Italy)
Work duration:
1998

Gas pipeline Settimo Torinese - Rivoli

Gas pipeline Settimo Torinese - Rivoli

Read more
CUSTOMER:
Bonatti
LOCATION:
Settimo Torinese (Italy)
Work duration:
1998

Opencut crossing Duero river

Opencut crossing Duero river

Read more
CUSTOMER:
Araza U.T.E.
LOCATION:
Castilla y Leon Region (Spain)
Work duration:
1997

Edison thermoelectric pipeline connection

Edison thermoelectric pipeline connection

Read more
CUSTOMER:
Sicim
LOCATION:
Parma province (Italy)
Work duration:
1997

Accommodation beach Pellestrina, Venice

Accommodation beach Pellestrina, Venice

Read more
CUSTOMER:
Soc. consortile ripascimenti Venezia - Roma
LOCATION:
Venice (Italy)
Work duration:
1996

Gas pipeline Montpellier - Nimes

Gas pipeline Montpellier - Nimes

Read more
CUSTOMER:
DLE - Bonatti
LOCATION:
South of France
Work duration:
1996

Opencut crossing - Ticino River - DN 750 (36")

Opencut crossing - Ticino River - DN 750 (36")

Read more
CUSTOMER:
Unione SpA
LOCATION:
Besate (Italy)
Work duration:
1996

Opencut crossing - Dora River - DN 400 (16") section Hone - Champ de Praz

Opencut crossing - Dora River - DN 400 (16") section Hone - Champ de Praz

Read more
CUSTOMER:
TreColli
LOCATION:
Work duration:

Gas pipeline DN 400 (16") - Cortamaggiore-Genova, section Voghera-Novi Ligure

Gas pipeline DN 400 (16") - Cortamaggiore-Genova, section Voghera-Novi Ligure

Read more
CUSTOMER:
Sintec
LOCATION:
Genova (Italy)
Work duration:
1996

Gas pipeline DN 1200 (48") - Marradi - Castelbolognese

Gas pipeline DN 1200 (48") - Marradi - Castelbolognese

Read more
CUSTOMER:
Sicim
LOCATION:
Forlì (Italy)
Work duration:
1996

Gas pipeline DN 1200 (48") - Parma - Cortemaggiore

Gas pipeline DN 1200 (48") - Parma - Cortemaggiore

Read more
CUSTOMER:
Sicim
LOCATION:
Parma - Cortemaggione (Italy)
Work duration:
1995

Demolition of building in Rue des alouettes de la villette

Demolition of building in Rue des alouettes de la villette

Read more
CUSTOMER:
Promopar
LOCATION:
Paris (France)
Work duration:
1995

Gas pipeline DN 1200 (48") Mortara - Rognano

Gas pipeline DN 1200 (48") Mortara - Rognano

Read more
CUSTOMER:
Bonatti
LOCATION:
Mortara - Rognano (Italy)
Work duration:
1995

Gas pipeline Cervignano D'adda - Rivolta D'Adda DN 1200 (48")

Gas pipeline Cervignano D'adda - Rivolta D'Adda DN 1200 (48")

Read more
CUSTOMER:
SAIPEM
LOCATION:
Cervignano D'Adda (Italy)
Work duration:
1995

SNAM Pipeline Ripalta-Cortemaggiore DN 1200 (48 ")

SNAM Pipeline Ripalta-Cortemaggiore DN 1200 (48 ")

Read more
CUSTOMER:
SAIPEM
LOCATION:
Caorso e Caselle Landi (Italy)
Work duration:
1994

Excavation for the construction of the main irrigation canal "Haut-service".

Excavation for the construction of the main irrigation canal "Haut-service".

Read more
CUSTOMER:
Icori estero
LOCATION:
Abda-Doukkala (Morocco)
Work duration:
1994

Laying works of a pipeline shooting

Laying works of a pipeline shooting

Read more
CUSTOMER:
Subwork Italia
LOCATION:
Carezzole (Italy)
Work duration:
1994

River crossing for the realization and integration of aqueducts in the Treviso area

River crossing for the realization and integration of aqueducts in the Treviso area

Read more
CUSTOMER:
Idrotrev Scarl
LOCATION:
Treviso (Italy)
Work duration:
1994

SNAM DN 1200 (48") methane pipeline sub-river crossing of the Arno river

SNAM DN 1200 (48") methane pipeline sub-river crossing of the Arno river

Read more
CUSTOMER:
Ghizzoni
LOCATION:
Lateriana (Italy)
Work duration:
1994

Excavation of line for SNAM pipeline section Cervignano D'Adda - Rivolta D'Adda DN 1200 (48")

Excavation of line for SNAM pipeline section Cervignano D'Adda - Rivolta D'Adda DN 1200 (48")

Read more
CUSTOMER:
EUMOTERMAR
LOCATION:
Cervignano D'Adda - Rivolta D'Adda (Italy)
Work duration:
1994

Emergency intervention for the construction of the Montechecco landfill

Emergency intervention for the construction of the Montechecco landfill

Read more
CUSTOMER:
Ecopadana
LOCATION:
La Spezia (Italy)
Work duration:
1994

Rock excavation for gas pipeline DN 100 (40")

Rock excavation for gas pipeline DN 100 (40")

Read more
CUSTOMER:
Bonatti Rotus GMBH
LOCATION:
Pirmasens (Germany)
Work duration:
1994

CUSTOMER:
LOCATION:
Work duration:
1993-1994

Excavation for the double penstock for Enel power plant

Excavation for the double penstock for Enel power plant

Read more
CUSTOMER:
Enel
LOCATION:
Cordenonds (Italy)
Work duration:
1993-1994

Crossing of the sub-river Olona torrent

Crossing of the sub-river Olona torrent

Read more
CUSTOMER:
UNIMONT
LOCATION:
Tradate (Italy)
Work duration:
1993

Excavations and earthworks for the "saturina" landfill

Excavations and earthworks for the "saturina" landfill

Read more
CUSTOMER:
SIGI
LOCATION:
La Spezia (Italy)
Work duration:
1993

Buccino - Montesano pipeline

Buccino - Montesano pipeline

Read more
CUSTOMER:
SAIPEM
LOCATION:
Buccino - Montesano (Italy)
Work duration:
1993

Ponente Ligure pipeline

Ponente Ligure pipeline

Read more
CUSTOMER:
I.CO.GEM.
LOCATION:
Ponente Ligure (Italy)
Work duration:
1993

Sub-river crossing for the Magra river methane pipeline

Sub-river crossing for the Magra river methane pipeline

Read more
CUSTOMER:
Ghizzoni
LOCATION:
Piani di Arcola (Italy)
Work duration:
1993

Crossing for Snam gas pipeline of Dora - Baltea river

Crossing for Snam gas pipeline of Dora - Baltea river

Read more
CUSTOMER:
Bonatti
LOCATION:
Crescentino (Italy)
Work duration:
1993

Snam pipeline DN 750 (30") section Poirino - Nichelino

Snam pipeline DN 750 (30") section Poirino - Nichelino

Read more
CUSTOMER:
Bonatti
LOCATION:
Poirino - Nichelino (Italy)
Work duration:
1993

Emergency intervention for Agip outbreak of Trecate

Emergency intervention for Agip outbreak of Trecate

Read more
CUSTOMER:
Bonatti
LOCATION:
Trecate (Italy)
Work duration:
1993

CUSTOMER:
LOCATION:
Work duration:
1992

Execution of sub-river crossing for AGIP and SNAM gas pipeline

Execution of sub-river crossing for AGIP and SNAM gas pipeline

Read more
CUSTOMER:
Bonatti
LOCATION:
Galiate (Italy)
Work duration:
1992

River crossing for the realization of the methane pipeline DN 900 (36") Terranuova B. - Montelupo F.

River crossing for the realization of the methane pipeline DN 900 (36") Terranuova B. - Montelupo F.

Read more
CUSTOMER:
Unione SpA
LOCATION:
Firenze (Italy)
Work duration:
1992

Sub-river crossing in the Borgo Valsugana section for the construction of the DN 600 (24") pipeline

Sub-river crossing in the Borgo Valsugana section for the construction of the DN 600 (24") pipeline

Read more
CUSTOMER:
SICIM
LOCATION:
Borgo Valsugana (Italy)
Work duration:
1992

Melizzano - Vastogirardi gas pipeline

Melizzano - Vastogirardi gas pipeline

Read more
CUSTOMER:
SAIPEM
LOCATION:
Pescolanciano - Isernia (Italy)
Work duration:
1992

CUSTOMER:
LOCATION:
Work duration:
1991

Execution of N.11 sub-river crossings including the connection paths in the stretch Vasto - S. Salvo

Execution of N.11 sub-river crossings including the connection paths in the stretch Vasto - S. Salvo

Read more
CUSTOMER:
SAIPEM
LOCATION:
Vasto (Italy)
Work duration:
1991

Execution of the crossings of the Piave river in the locality of Onigo and in the locality of Masetti for the construction of the methane pipeline Istrana - Feltre DN 600 24" section Vas - Seren del Grappa.

Execution of the crossings of the Piave river in the locality of Onigo and in the locality of Masetti for the construction of the methane pipeline Istrana - Feltre DN 600 24" section Vas - Seren del Grappa.

Read more
CUSTOMER:
SICIM
LOCATION:
Istrana - Feltre (Italy)
Work duration:
1991

Intervention for the execution of sub-bed crossing of Isonzo * Vipacco 1 * Vipacco 2 rivers

Intervention for the execution of sub-bed crossing of Isonzo * Vipacco 1 * Vipacco 2 rivers

Read more
CUSTOMER:
SAIPEM
LOCATION:
Gorizia (Italy)
Work duration:
1991

CUSTOMER:
LOCATION:
Work duration:
1990

U.R.S.S. importation gas pipeline section Oderzo - Istrana

U.R.S.S. importation gas pipeline section Oderzo - Istrana

Read more
CUSTOMER:
Unione SpA
LOCATION:
Ponte della Priula (Italy)
Work duration:
1990

Demolition of ITALCEMENTI buildings

Demolition of ITALCEMENTI buildings

Read more
CUSTOMER:
Lorigiola Alessandro
LOCATION:
Padova
Work duration:
1990

Chiuduno - Albino gas pipeline Entratico - Albino section DN 400 (16")

Chiuduno - Albino gas pipeline Entratico - Albino section DN 400 (16")

Read more
CUSTOMER:
Ghizzoni SpA
LOCATION:
Albino - Italy
Work duration:
1990